Industries · Fabricators

AI quoting for fabricators: rate tables yes, drawings no

Rate-table quotes, yes; drawings and machine time, no. Staffbox drafts the lookup part and declines the rest. Not yet tested on a real shop.

Most fabrication quotes are built from material cost, process rates and quantity breaks, not from a catalog. Part of that is arithmetic on a table and part is an estimator reading a drawing, and a tool that blurs the two prices a guess. Staffbox drafts only the table half and passes the rest to a person. Send up to three table-driven requests your shop already answered; drafts come back within 2 business days.

Updated 14 October 2026

Free 30-day pilot, then $595 a month at founding sites (first 100) for as long as the box is live (draft pricing). No customer install yet.

No lock-in. From the 101st unit: $695 per month with $1,800 onboarding. We first score 30 of your table-driven quotes for free, and only a passing score leads to a pilot.

Stock and repeat parts are lookups; a new custom part is estimator work

Our read of the segment, not measured on a fabricator. Three kinds of request reach a shop's inbox, and only the first two sit close to what Staffbox does today.

  • Stock or catalog parts. Standard brackets, plate cut to size, tube by the foot, hardware. The price comes from a table, so this is the nearest fit.
  • Repeat parts. "Quote 500 of part 4471 again." The earlier quote acts as the price list. That needs your past quotes in the brain, and it is not measured yet.
  • New custom parts. A drawing or a sketch, a material, a finish, a quantity. Machine time, programming and setup are an estimator's judgement, and Staffbox makes no attempt at them.

So the boundary is plain before you send anything. Staffbox does not:

  • read drawings, 3D models or tolerance callouts;
  • estimate machine time, nesting or material yield;
  • connect to a shop-floor or ERP system (the pilot reads one price-list file);
  • send quotes. A person approves every draft, and the unit has no sending code.

A draft prices only what the table covers and asks about the rest

Here is how one request breaks apart. The plate, the quantity and the unit are things a rate table can answer. The tolerance note and the missing drawing are not, so that part goes back to a person instead of being priced.

Anatomy of an invented fabrication request: part and material, quantity, unit and price tier are looked up in the rate table; the missing drawing and tolerance make the draft decline that part and ask a person. Illustrative request · invented Can you quote 200 of the 6×8 plate, 10 ga mild steel, 2 holes? Price each. Tolerance per drawing, drawing to follow. what the draft reads 1Part and material"6×8 plate, 10 ga mild steel"→ material row by form and size, dated 2Quantity"200"→ multiplies blank, cut and setup lines 3Unit"price each"→ states the unit it priced: per part 4Price tier200 lands in one quantity-break row→ uses that break, cites the row 5Missing: drawing and tolerance"tolerance per drawing, to follow"→ declines that part, asks a person
Invented request for illustration, not a test result; no fabricator rate table has been tested. Steps 1 to 4 and the decline in step 5 are how the quote action behaved on the fictional test sets, 6 Oct 2026. Source: results files on GitHub.

On the fictional test sets, that decline is what actually happened when a fact was missing. Across the 6 Oct runs there were 0 wrong totals in 475 answers; of the 11 misses, 10 were declines that asked the customer and 1 was a routing slip. In our view, a shop would rather get a question back on a part with no material called out than a confident number. On a new trade it had never seen, an electrical distributor (14 Oct, Dell test box), the default Qwen3 8B setup scored 30 of 40 and 2 of 15 on messy requests, with 8 wrong prices in 55, because per-foot units, price levels and trade shorthand are not handled yet; that is why we score your own list first (the electrical result).

Staffbox · quotes deskillustrative · not a test result
Request · a repeat customer (invented)

quote 50 mounting plates 6x8, 10ga mild steel, 2 holes. powder coat?

Draft
Material · 50 × 10 ga MS blank 6×8 at $3.20$160.00
Laser cut · 50 × $2.75$137.50
Setup · once per order$85.00
Powder coat · colour not givenasks
Total before coating$382.50
Sources the draft cites
  • rates · 10 ga mild steel, per blank · dated 1 Oct
  • rates · laser cut, simple part under 2 ft of cut · dated 1 Oct
  • rates · setup charge per order · dated 1 Oct
illustrative example · invented numbersNext: your review · nothing sent
Invented for illustration. The material, cut and setup rates and their dates are fictional and come from no shop's tables. No fabricator rate table has been tested.

The rate table has to hold what now lives in the estimator's head

A draft is only as good as the table behind it. For most shops that means writing down, in plain Markdown, rules an experienced estimator applies without thinking:

  • Material price by form, grade and size, with the date of the price.
  • Process rates, such as an hourly rate by operation, and the minimum charge per order.
  • Quantity breaks and setup charges.
  • Finish and outside-processing prices, such as powder coat, plating or heat treat.
  • What always goes to a person: a tolerance note, a certification requirement, a drawing revision.

If a price is a formula rather than a row, write the formula out in plain words and include past quotes that used it. The demo tests have the same shape (look up rows, multiply, add options, refuse when a required fact is missing), but formula-driven lists are untested, so the first score will tell you whether yours reproduces.

Thirty past requests show whether your tables reproduce your own quotes

  • The material and process tables you quote from, as files, each with its date.
  • 30 past requests you would call table-driven, plus three that needed an estimator, so we can show you the draft declining them.
  • The rules about what a person always checks.
  • The quote you actually sent for each, so the draft is compared with your real figure.

Nothing gets installed in your shop for this. The requests and tables run on our own Mac mini in Atlanta, your team grades 10 held-back answers without knowing which are ours, and the files are deleted within 14 days of sending your results (per our draft data policy). A pass bar is agreed before day 0, and a refusal counts against the score just as a wrong price does. We have not tested a fabricator's tables, so expect the first pass to expose a rule nobody wrote down.

Why a cabinet shop is the easier case: its list looks like a catalog with options on top, which is where our evidence is strongest. A fabricator's list is mostly rates and formulas, which makes it a harder test of arithmetic on the brain's rules. That is a guess, not a result; the cabinet page has the scores we do have.

Questions

Can Staffbox quote a part from a drawing?

No. It does not read drawings and does not estimate machine time. It drafts from a price list or rate table.

What if my price is a formula?

Write the formula in plain words in the brain and send past quotes that used it. The 30-quote test shows whether the draft reproduces your numbers. We have not tested formula-driven lists yet.

Do you have any fabricator customers?

No. No customer has run Staffbox yet, and no fabricator list has been tested.

Sources

Or call us: 404 493 6248 · Email sales

Free testTextCall